Some of the current timeout error messages are confusing, because they do not suggest that the issue is most likely a slow test. This PR updates timeout messages as follows:
- Test timeout of 30000ms exceeded.
- Test timeout of 30000ms exceeded while setting up "browser".
- Test timeout of 30000ms exceeded while tearing down "context".
- Test timeout of 30000ms exceeded while setting up "playwright configuration".
- Test timeout of 30000ms exceeded while running "beforeEach" hook.
- Test timeout of 30000ms exceeded while running "afterEach" hook.
- "beforeAll" hook timeout of 30000ms exceeded.
- "afterAll" hook timeout of 30000ms exceeded.
- Worker teardown timeout of 30000ms exceeded.
- "skip" modifier timeout of 30000ms exceeded.
- Fixture "myCustomFixture" timeout of 5000ms exceeded.
Previously, screenshot was taken after hooks and fixtures teardown.
However, hooks can easily modify the state of the page, and
screenshot would not reflect the moment of failure.
Instead, we take screenshots immediately after the test function
finishes with an error.
Adds cross-browser support for easily allowing/blocking Service Workers via a Context option.
Includes plumbing for Playwright Test's `use`.
Resolves#14522.
Relates #1090.
Supercedes #14321.
There are a few issues this covers:
- Some fixtures like `page` and `context` are not allowed in `beforeAll`
hooks, so using them in automatic fixture makes it throw.
- Running automatic fixture solely for `afterAll` is unexpected.
This currently happens when `afterAll` is run for cleanup after
fixture timeout/throw.
For built-in playwright fixture, we keep `'all-hooks-included'` auto mode.
Added a doc explaining the execution order.
- Always show a fixture that was running during timeout.
- Give custom titles to built-in fixtures.
- Specify setup/teardown fixture phase in the message.
- Split connect vs launch browser fixtures for better naming.
Example timeout message:
```log
Timeout of 2000ms exceeded while running fixture "built-in playwright configuration" teardown.
```
To make launch/connect not affect the test timeout:
- `browser` fixture is declared with `timeout: 0`.
- Default timeouts are set to 30sec for launch and 3min for connect.
By default, fixtures share timeout with the test they are instantiated for.
However, for more heavy fixtures, especially worker-scoped ones, it makes
sense to have a separate timeout.
This introduces `{ timeout: number }` option to the list of fixture options
that opts the fixture into a dedicated timeout rather than sharing it
with the test.
Reland: worker.stop() before worker.run() was hanging because
`_runFinished` promise was not initially resolved.
---
This moves `beforeAll`, `afterAll` and some modifiers from running
as a separate entity into running inside a test.
Pros:
- All errors are reported as test errors.
- All artifacts are collected as test artifacts.
- Reporters support this out of the box.
Details:
- Each test computes the necessary hooks to run and runs them.
- Teardown is usually performed during the test (on test failure or worker stop).
- `skipRemaining` is added to `DonePayload` to preserve the behavior
where `beforeAll` hook failure skips subsequent tests.
This behavior can now be improved to only target tests affected by this hook.
* Revert "fix(hooks): separate test timeout from beforeAll/afterAll timeouts (#12413)"
This reverts commit 73dee69558110b00916708dafaa99e121c6e7c94.
* Revert "fix(test-runner): rely on test title paths instead of ordinal (#12414)"
This reverts commit d744a87aeefe9c131ed10cedfff201efa1b5c156.
* Revert "chore(test runner): run hooks/modifiers as a part of the test (#12329)"
This reverts commit 47045ba48dd84d38bde17541c8a0a05cdfed7ffc.
chore(test runner): run hooks/modifiers as a part of the test
This moves `beforeAll`, `afterAll` and some modifiers from running
as a separate entity into running inside a test.
Pros:
- All errors are reported as test errors.
- All artifacts are collected as test artifacts.
- Reporters support this out of the box.
Details:
- Each test computes the necessary hooks to run and runs them.
- Teardown is usually performed during the test (on test failure or worker stop).
- `skipRemaining` is added to `DonePayload` to preserve the behavior
where `beforeAll` hook failure skips subsequent tests.
This behavior can now be improved to only target tests affected by this hook.
This way we control the timeout error message from the runner,
so that later on we can differentiate between test timeout, fixture
timeout and hook timeout.
Soft expects will still fail the test, but will not abort it's execution. As a consequence of this:
- `TestResult` now might have multiple errors, which is reflected with a new `testResult.erros: TestError[]` field.
- `TestInfo` now might have multiple errors as well, which is reflected with a new `testInfo.errors: TestError[]` field.
Fixes#7819
1. Fixtures defined in test.extend() can now have `{ option: true }` configuration that makes them overridable in the config. Options support all other properties of fixtures - value/function, scope, auto.
```
const test = base.extend<MyOptions>({
foo: ['default', { option: true }],
});
```
2. test.declare() and project.define are removed.
3. project.use applies overrides to default option values and nothing else. Any test.extend() and test.use() calls take priority over config options.
Required user changes: if someone used to define fixture options with test.extend(), overriding them in config will stop working. The solution is to add `{ option: true }`.
```
// Old code
export const test = base.extend<{ myOption: number, myFixture: number }>({
myOption: 123,
myFixture: ({ myOption }, use) => use(2 * myOption),
});
// New code
export const test = base.extend<{ myOption: number, myFixture: number }>({
myOption: [123, { option: true }],
myFixture: ({ myOption }, use) => use(2 * myOption),
});
```