Currently, it is possible to run a function, e.g. a second `beforeEach` hook,
that will receive `null` for the fixture that has already failed before.
This PR skips running any user function that uses a fixture that has already
failed, just like if the fixture would be initialized again and failing for
the second time.
Some of the current timeout error messages are confusing, because they do not suggest that the issue is most likely a slow test. This PR updates timeout messages as follows:
- Test timeout of 30000ms exceeded.
- Test timeout of 30000ms exceeded while setting up "browser".
- Test timeout of 30000ms exceeded while tearing down "context".
- Test timeout of 30000ms exceeded while setting up "playwright configuration".
- Test timeout of 30000ms exceeded while running "beforeEach" hook.
- Test timeout of 30000ms exceeded while running "afterEach" hook.
- "beforeAll" hook timeout of 30000ms exceeded.
- "afterAll" hook timeout of 30000ms exceeded.
- Worker teardown timeout of 30000ms exceeded.
- "skip" modifier timeout of 30000ms exceeded.
- Fixture "myCustomFixture" timeout of 5000ms exceeded.
Previously, screenshot was taken after hooks and fixtures teardown.
However, hooks can easily modify the state of the page, and
screenshot would not reflect the moment of failure.
Instead, we take screenshots immediately after the test function
finishes with an error.
There are a few issues this covers:
- Some fixtures like `page` and `context` are not allowed in `beforeAll`
hooks, so using them in automatic fixture makes it throw.
- Running automatic fixture solely for `afterAll` is unexpected.
This currently happens when `afterAll` is run for cleanup after
fixture timeout/throw.
For built-in playwright fixture, we keep `'all-hooks-included'` auto mode.
Added a doc explaining the execution order.
By default, fixtures share timeout with the test they are instantiated for.
However, for more heavy fixtures, especially worker-scoped ones, it makes
sense to have a separate timeout.
This introduces `{ timeout: number }` option to the list of fixture options
that opts the fixture into a dedicated timeout rather than sharing it
with the test.
Previously, we used to skip all the tests from the same file when
any `beforeAll` fails in the file.
Now, we only skip the rest of the tests affected by this particular
`beforeAll` and continue with other tests in the new worker.
Reland: worker.stop() before worker.run() was hanging because
`_runFinished` promise was not initially resolved.
---
This moves `beforeAll`, `afterAll` and some modifiers from running
as a separate entity into running inside a test.
Pros:
- All errors are reported as test errors.
- All artifacts are collected as test artifacts.
- Reporters support this out of the box.
Details:
- Each test computes the necessary hooks to run and runs them.
- Teardown is usually performed during the test (on test failure or worker stop).
- `skipRemaining` is added to `DonePayload` to preserve the behavior
where `beforeAll` hook failure skips subsequent tests.
This behavior can now be improved to only target tests affected by this hook.
* Revert "fix(hooks): separate test timeout from beforeAll/afterAll timeouts (#12413)"
This reverts commit 73dee69558110b00916708dafaa99e121c6e7c94.
* Revert "fix(test-runner): rely on test title paths instead of ordinal (#12414)"
This reverts commit d744a87aeefe9c131ed10cedfff201efa1b5c156.
* Revert "chore(test runner): run hooks/modifiers as a part of the test (#12329)"
This reverts commit 47045ba48dd84d38bde17541c8a0a05cdfed7ffc.
chore(test runner): run hooks/modifiers as a part of the test
This moves `beforeAll`, `afterAll` and some modifiers from running
as a separate entity into running inside a test.
Pros:
- All errors are reported as test errors.
- All artifacts are collected as test artifacts.
- Reporters support this out of the box.
Details:
- Each test computes the necessary hooks to run and runs them.
- Teardown is usually performed during the test (on test failure or worker stop).
- `skipRemaining` is added to `DonePayload` to preserve the behavior
where `beforeAll` hook failure skips subsequent tests.
This behavior can now be improved to only target tests affected by this hook.
This reverts commit e5c9d1e39fd0e4bb30e25d69adba2cc7ae3f0071.
Reason for revert: turns out this fix results in a 5-second delay
when starting tests in docker, with `test-results` folder being
a non-removable mount.
The reason for the delay is the `maxBusyTries` option that we
supply by default to rimraf when trying to remove the folder.
While this option might come handy when removing temporary
browser profile folder, it doesn't serve us well in this particular
usecase.
References #12106
This way we control the timeout error message from the runner,
so that later on we can differentiate between test timeout, fixture
timeout and hook timeout.
Soft expects will still fail the test, but will not abort it's execution. As a consequence of this:
- `TestResult` now might have multiple errors, which is reflected with a new `testResult.erros: TestError[]` field.
- `TestInfo` now might have multiple errors as well, which is reflected with a new `testInfo.errors: TestError[]` field.
Fixes#7819
This reworks DeadlineRunner to use exception to signal timeout. This way,
we'll be able to run fixtures against a shared deadline vs their own
deadline and still get an easy control-flow timeout handling.
In several of the Playwright APIs, falsey values were not handled correctly. This changeset adds tests (and some fixes):
- route.continue: If options.postData was the empty string, the continue failed to override the post data.
- page.post (application/json with options.data: false|''|0|null): Raw falsey values were getting dropped (i.e. you can't do the equivalent of curl --header application/json … -d 'false'). This has been fixed with most values across all browsers, but an additional fix is needed for 'null' which the channel serializer treats extra specially.
- testInfo.attach: This didn't get reported as an error when options.path was the empty string, but should have been.
#11413 (and its fix#11414) inspired this search as they are the same
class of bug.
- Use file path, not content to calculate the attachment hash.
- Always cleanup fixture from the list on teardown, to avoid reporting
teardown error multiple times: from the test, and from the cleanup.
This prepares for beforeAll/afterAll hooks to be handled in the same way.
Since we do not know in advance whether a hook will run, we must create
TestResults lazily.
feat(api): add explicit async testInfo.attach
We add an explicit async API for attaching file paths (and Buffers) to
tests that can be awaited to help users ensure they are attaching files
that actually exist at both the time of the invocation and later when
reporters (like the HTML Reporter) run and package up test artifacts.
This is intended to help surface attachment issues as soon as possible
so you aren't silently left with a missing attachment
minutes/days/months later when you go to debug a suddenly breaking test
expecting an attachment to be there.
NB: The current implemntation incurs an extra file copy compared to
manipulating the raw attachments array. If users encounter performance
issues because of this, we can consider an option parameter that uses
rename under the hood instead of copy. However, that would need to be
used with care if the file were to be accessed later in the test.